28/11/2010 - Updated the last of the Donor section, from now on updates appear in the build section. The chassis is now ready for paint and then building up into a kit !

05/12/2010 - Updated build section with prep work after finally finishing all the welding.

20/12/2010 - Updated build section, chassis now finished ready for adding suspension..

03/01/2011 - Updated build section, Gearbox and Front Beam prepared.

09/01/2011 - Updated build section, Gearbox and Front Beam now fitted.

16/01/2011 - Updated build section, Trial fitted front disk conversion and adjustable rear spring plates

23/01/2011 - Updated build section, Rolling chassis almost ready

30/01/2011 - Updated build section, Brake pipes, pedals and cables fitted,

06/02/2011 - Updated build section,Chassis finished off, temporary Wheels fitted

13/02/2011 - Updated build section,Started on the engine re-furbish

20/02/2011 - Updated build section,Engine re-furbish nearly finished

27/02/2011 - Updated build section,Engine in !!!

06/03/2011 - Updated build section, It's Alive !! engine started!

13/03/2011 - Updated build section, Floor and 356 wheels fitted

19/03/2011 - Updated Kit Arrives , Yep..its here !!

20/03/2011 - Updated Body Fitted, Major Milestone, the body is on !!

26/03/2011 - Updated Body Bolted on,it all fits !!!

02/04/2011 - Updated Started cleaning up body , Lots of elbow grease required

09/04/2011 - Updated Body polished , Took a while and lots of cutting paste, but looks good.

17/04/2011 - Updated Loom Started , Started fitting the loom and trying to make sense of the connections

25/04/2011 - Updated Loom Fitted , Loom in, and started connecting up some of the electrical items

30/04/2011 - Updated Bumper Deco and headlights fitted , started to fit some of the deco parts.

08/05/2011 - Updated Started to fit some of the trim , side trim fitted.

15/05/2011 - Updated Engine Tray and Silencer fitted ,Finished off wiring in engine bay, fitted engine tray .

22/05/2011 - Updated Steering Column fitted ,Bled brakes and fitted steering column.

29/05/2011 - Updated Gauges and Steering Wheel fitted ,Bled brakes and fitted steering column.

05/06/2011 - Updated Wind up windows fitted , Finally fitted the side windows..still waiting for leather.

19/06/2011 - Updated Fitted heater cables and repaired oil seal, Finally heater cables and repaired a rear Oil seal.

02/07/2011 - Updated Finished Electrics and started enginel, STILL waiting for remaining parts....

17/07/2011 - Updated Fleather,carpets and seats in ! , At last parts have arrived :-)

14/08/2011 - Updated Final finishing off work ready for IVA , Getting ready for IVA and finishing off jobs.

28/08/2011 - Updated Final fitment of IVA parts , Getting ready for IVA.

16/10/2011 - Updated Final fitment of IVA parts , Still getting ready for IVA, fitted upper seat belt mount.

30/10/2011 - Updated Final fitment of IVA parts , Still getting ready for IVA, moved switches...

10/12/2011 - Updated IVA date 20/12/2011 , Last minute prep work...

23/12/2011 - Updated Failed IVA :-(, At least its only two fail points.

14/01/2012 - Updated Fixed the IVA fail points , At least its only two fail points.

24/01/2012 - Updated Passed IVA !!!!! , Yay :-) ;-)